2theadvocate.com | Traffic | Road Work/Closures for Aug. 30, 2009 — Baton Rouge, LA
Baton Rouge Temperature: 47°

TRAFFIC

Road Work/Closures for Aug. 30, 2009

  • Published: Aug 30, 2009 - Page: 5B

Road work

  • Traffic signals on Convention Street between Sixth and Third streets converted to four-way stops for installation of new traffic signals.
  • Honore Lane from Siegen Lane to Fieldstone Drive closed from 7 a.m. to 7 p.m. to install shafts and deep sewer with manholes. Open to local and emergency traffic only with access from Fieldstone. Alternate routes: Siegen to Fieldstone.
  • Strain Road bridge between O’Neal Lane and McLemore Drive closed for repairs. A temporary one-lane, two-way crossing provided for Strain Road. Motorists cautioned to yield to oncoming traffic for the temporary crossing.
  • Mancuso Lane at Picardy Avenue closed to extend Picardy Avenue. Alternate route: Summa Avenue.
  • Coursey Boulevard westbound from Jones Creek Road to Hickory Ridge Boulevard closed for concrete repair. Traffic reduced to two lanes on the eastbound side of Coursey.
  • Old Hammond Highway between Sherwood Forest Boulevard and Sharp Road closed for repairs to concrete wall.
  • The right lane of Convention Street from 5th Street to 4th Street closed for construction on St. James Church, School and Administration buildings.

    Most Popular     Most Emailed     Hot Topics    
ADVERTISEMENTS








PROMOTIONS


 
Envelope icon Have a question, comment, news tip or story idea? Click here to give us some feedback.