2theadvocate.com | Traffic | Road Work for Aug. 17, 2009 — Baton Rouge, LA
Baton Rouge Temperature: 47°

TRAFFIC

Road Work for Aug. 17, 2009

  • Published: Aug 17, 2009 - Page: 2B

Road work

  • Traffic signals on Convention Street between Sixth Street and Third Street converted to four-way stops for construction of new traffic signals.
  • Honore Lane from Siegen Lane to Fieldstone Drive closed from 7 a.m. to 7 p.m. to install shafts and deep sewer with manholes. Open to local and emergency traffic only with access from Fieldstone. Detour: Siegen to Fieldstone.
  • Strain Road bridge between O’Neal Lane and McLemore Drive closed for repairs. A temporary one-lane, two-way crossing provided for Strain Road. Motorists cautioned to yield to oncoming traffic for the crossing.
  • Mancuso Lane at Picardy Avenue closed to extend Picardy Avenue. Detour: Summa Avenue.
  • Coursey Boulevard westbound from Jones Creek Road to Hickory Ridge Boulevard will be closed to do concrete repair. Traffic will be reduced to two lanes on the eastbound side of Coursey.
  • Old Hammond Highway between Sherwood Forest Boulevard and Sharp Road closed.

    Most Popular     Most Emailed     Hot Topics    
ADVERTISEMENTS








PROMOTIONS


 
Envelope icon Have a question, comment, news tip or story idea? Click here to give us some feedback.