2theadvocate.com | Traffic | Road Work/Closures for July 6, 2009 — Baton Rouge, LA
Baton Rouge Temperature: 47°
Saturday, November 21, 2009

TRAFFIC

Road Work/Closures for July 6, 2009

  • Published: Jul 6, 2009 - Page: 2B

Road work

  • Perkins Road between Reymond Avenue and Christian Street closed for repairs to the overpass. Alternate routes: Hundred Oaks Avenue and South Acadian Thruway.
  • East approach of Reiger Road at Siegen Lane closed for construction of turn lanes. Alternative routes: Industriplex Boulevard and Exchequer Drive.
  • Traffic signals on Convention Street between 6th Street and 3rd Street converted to four-way stops for construction of new traffic signals.
  • Honore Lane from Siegen to Fieldstone closed from 7 a.m. to 7 p.m. to install shafts and deep sewer with manholes. Open to local and emergency traffic only with access from Fieldstone. Alternate routes: Siegen to Fieldstone.

    Most Popular     Most Emailed     Hot Topics    
ADVERTISEMENTS








PROMOTIONS


 
Envelope icon Have a question, comment, news tip or story idea? Click here to give us some feedback.