Interstate 12 between the Millerville road overpass and the East Baton Rouge-Livingston parish line narrowed from 6 p.m. to 9 a.m. for repairs.
All intersections of North Street from River Road to Sixth Street narrowed to two lanes from 6:30 a.m. to 6:30 p.m. for construction of traffic signal and handicap ramps.
North Harrell’s Ferry Road between Old Hammond Highway and Sherwood Forest Boulevard one way eastbound for construction.