2theadvocate.com | Traffic | Road Work, Closures for Week of Oct. 19, 2008 — Baton Rouge, LA
Baton Rouge Temperature: 47°

TRAFFIC

Road Work, Closures for Week of Oct. 19, 2008

  • Published: Oct 19, 2008 - Page: 5B - UPDATED: 12:05 a.m.
All Week
  • Sections of Convention, Fifth and Fourth streets narrowed or closed for construction.
  • Interstate 12 between the Millerville road overpass and the East Baton Rouge-Livingston line narrowed 6 p.m. to 9 a.m. for repairs.
  • South Boulevard at St. Phillip Street narrowed to one lane, 6:30 a.m. to 8:30 p.m.
  • La. 3034 left turn at Old Wax Road narrowed to two lanes from 6:30 a.m. to 6:30 p.m.
  • All intersections of North Street from River Road to Sixth Street narrowed to two lanes from 6:30 a.m. to 6:30 p.m. for construction of traffic signal and handicap ramps.
  • North Harrell’s Ferry Road between Old Hammond Highway and Sherwood Forest Boulevard one way eastbound for construction.
  • One lane at 12757 Coursey Boulevard closed for repair from 8 a.m. to 3 p.m. until Tuesday.

    Most Popular     Most Emailed     Hot Topics    
ADVERTISEMENTS








PROMOTIONS


 
Envelope icon Have a question, comment, news tip or story idea? Click here to give us some feedback.