Road Work for July 21-26
All Week
- Sections of Convention, Fifth and Fourth streets narrowed or closed for construction.
- Florida Boulevard from Stevendale Road to Centerway Boulevard closed intermittently from 9 a.m. to 4 p.m. to upgrade traffic signals.
- Woodlake Drive closed at Jones Creek Bridge for repairs. Alternate route: South Harrell’s Ferry Road to O’Neal Lane to George O’Neal Road to Antioch Boulevard to Monitor Drive to Woodlake Drive.
- U.S. 61 between Perkins Road and Pecue Road narrowed from 7 p.m. to 6 a.m. for repairs. Alternate route: Old Jefferson Highway and Interstate 10.
- Interstate 12 between Millerville Road overpass and the East Baton Rouge Parish-Livingston Parish line narrowed from 6 p.m. to 9 a.m. for repairs.
- Stanford Avenue at LSU Avenue closed due to cave-in of storm drain. Alternate route: LSU Avenue to Highland Road to Lee Drive to Perkins Road.
- Blackwater Bayou Bridge closed for repairs. Alternate route: La. 408 to La. 67 to La. 64 to Blackwater Road.
| Most Popular | Most Emailed | Hot Topics | ||




Print
Email
Save
Share
Del.icio.us
Digg
Facebook
Reddit
